All heavy duty jobs require durable tools and the chain octopus is no exception. This tool is used to load and lift heavy loads. Special for construction projects that require the mobilization of heavy volumes of materials and work instruments. With a variety of cup-type shorteners or as a hook, very useful for shortening the chains.
Features - Chain Octopus
This presentation is two 8 mm branches with the direct hook to the chain
Oriented to construction work and heavy loads
For those slings that are loaded unevenly, a maximum load of work, which is determined by calculating as a sling of a branch in terms of the CMU
![]() |
![]() |
![]() |
|||||
| NOMINAL DIMENSION | SLINGS 1 BRANCH | 2 BRANCH SLINGS | SLINGS 3 AND 4 BRANCHES | ||||
| β<45° | 45°<β<60° | β<45° | 45°<β<60° | ||||
| Angle between opposite branches not applicable to 3 branches, α | α<90° | 90º<α<120° | α<90° | 90o<α<120° | |||
| Nominal dimension | MAXIMUM USE LOAD - CMU [kg]EN 818-4, safety coefficient 4:1 | ||||||
| mm | Grade | inch | Balanced loaded steel cable slings* | ||||
| 6 | 80 | 7/32" | 1,120 | 1,600 | 1,120 | 2,360 | 1,700 |
| 7 | 80 | 9/32" | 1,500 | 2,120 | 1,500 | 3,150 | 2,240 |
| 8 | 80 | 5/16" | 2,000 | 2,800 | 2,000 | 4,250 | 3,000 |
| 8 | 100 | 5/16" | 2,500 | 3,500 | 2,500 | 5,250 | 3,800 |
| 10 | 80 | 3/8" | 3,150 | 4,250 | 3,150 | 6,700 | 4,750 |
| 10 | 100 | 3/8" | 4,000 | 5,600 | 4,000 | 8,400 | 6,000 |
| 13 | 80 | 1/2" | 5,300 | 7,500 | 5,300 | 11,200 | 8,000 |
| 13 | 100 | 1/2" | 6,700 | 9,400 | 6,700 | 14,000 | 10,000 |
| 16 | 80 | 5/8" | 8,000 | 11,200 | 8,000 | 17,000 | 11,800 |
| 16 | 100 | 5/8" | 10,000 | 14,000 | 10,000 | 21,000 | 15,000 |
| 19 | 80 | 3/4 | 11,200 | 16,000 | 11,200 | 23,600 | 17,000 |
| 22 | 80 | 7/8 | 15,000 | 21,200 | 15,000 | 31,500 | 22,400 |
| 26 | 80 | 1 | 21,200 | 30,000 | 21,200 | 45,000 | 31,500 |
| 32 | 80 | 1 1/4 | 31,500 | 45,000 | 31,500 | 67,000 | 47,500 |
*For slings loaded unbalanced, the following CMU should be taken: · 2-leg slings, calculate the CMU as if it were
of 1-leg slings. · Slings with 3 and 4 legs, calculate the CMU as if it were slings with 2 legs.
USE
1. Do not lift with a twisted chain. 2. Shorten chains only with shortening hooks. Knots should be avoided. 3. When handling loads with edges, sharp points or cutting edges, the chains must be protected with appropriate padding or padding. 4. Hooks should not grab loads with their ends, but with the inside. 5. Hooks not used during lifting must be attached to the main ring. 6. Make sure that the ring can move freely on the crane hook. 7. Replace damaged accessories as soon as they are detected. 8. Do not overload the chains, check that the angle inclination is respected and, if in doubt, always choose a larger chain.
Includes approval plate indicating the workloads. Available CE quality certificate