The chain grab is a tool in the construction field that is used to carry weight and lift heavy loads that require one or more attachment points. Special for construction projects that require the loading and mobilization of heavy volumes of materials and work instruments.
Features - Chain Octopus</h2>
Presentation of 1 7 mm branch with safety hook for chains
Designed for jobs that require lifting and moving heavy loads such as construction materials, tools, among others
Built with materials that ensure an investment for quality of use and durability over time
![]() |
![]() |
![]() |
|||||
| NOMINAL DIMENSION | SLINGS 1 BRANCH | 2 BRANCH SLINGS | SLINGS 3 AND 4 BRANCHES | ||||
| β<45° | 45°<β<60° | β<45° | 45°<β<60° | ||||
| Angle between opposite branches not applicable to 3 branches, α | α<90° | 90º<α<120° | α<90° | 90o<α<120° | |||
| Nominal dimension | MAXIMUM USE LOAD - CMU [kg]EN 818-4, safety coefficient 4:1 | ||||||
| mm | Grade | inch | Balanced loaded steel cable slings* | ||||
| 6 | 80 | 7/32" | 1,120 | 1,600 | 1,120 | 2,360 | 1,700 |
| 7 | 80 | 9/32" | 1,500 | 2,120 | 1,500 | 3,150 | 2,240 |
| 8 | 80 | 5/16" | 2,000 | 2,800 | 2,000 | 4,250 | 3,000 |
| 8 | 100 | 5/16" | 2,500 | 3,500 | 2,500 | 5,250 | 3,800 |
| 10 | 80 | 3/8" | 3,150 | 4,250 | 3,150 | 6,700 | 4,750 |
| 10 | 100 | 3/8" | 4,000 | 5,600 | 4,000 | 8,400 | 6,000 |
| 13 | 80 | 1/2" | 5,300 | 7,500 | 5,300 | 11,200 | 8,000 |
| 13 | 100 | 1/2" | 6,700 | 9,400 | 6,700 | 14,000 | 10,000 |
| 16 | 80 | 5/8" | 8,000 | 11,200 | 8,000 | 17,000 | 11,800 |
| 16 | 100 | 5/8" | 10,000 | 14,000 | 10,000 | 21,000 | 15,000 |
| 19 | 80 | 3/4 | 11,200 | 16,000 | 11,200 | 23,600 | 17,000 |
| 22 | 80 | 7/8 | 15,000 | 21,200 | 15,000 | 31,500 | 22,400 |
| 26 | 80 | 1 | 21,200 | 30,000 | 21,200 | 45,000 | 31,500 |
| 32 | 80 | 1 1/4 | 31,500 | 45,000 | 31,500 | 67,000 | 47,500 |
*For slings loaded unbalanced, the following CMU should be taken: · 2-leg slings, calculate the CMU as if it were
of 1-leg slings. · Slings with 3 and 4 legs, calculate the CMU as if it were slings with 2 legs.
USE
1. Do not lift with a twisted chain. 2. Shorten chains only with shortening hooks. Knots should be avoided. 3. When handling loads with edges, sharp points or cutting edges, the chains must be protected with appropriate padding or padding. 4. Hooks should not grab loads with their ends, but with the inside. 5. Hooks not used during lifting must be attached to the main ring. 6. Make sure that the ring can move freely on the crane hook. 7. Replace damaged accessories as soon as they are detected. 8. Do not overload the chains, check that the angle inclination is respected and, if in doubt, always choose a larger chain.
Includes approval plate indicating the workloads. Available CE quality certificate